Permit Fees 2025 Updates
Division | Program | Fee Type | Former Fee | Fee Effective 7/1/2025 | Statutory Reference |
---|---|---|---|---|---|
Division of Energy, Mineral, and Land Resources | Mining | New Permit Application - 0-25 acres | $3,750 | $4,448 | 74-54.1.(a) |
Division of Energy, Mineral, and Land Resources | Mining | New Permit Application - 26+acres | $5,000 | $5,930 | 74-54.1.(a) |
Division of Energy, Mineral, and Land Resources | Mining | Permit Modifications - 0-25 acres | $750 | $890 | 74-54.1.(a) |
Division of Energy, Mineral, and Land Resources | Mining | Permit Modifications - 26+ acres | $1,000 | $1,186 | 74-54.1.(a) |
Division of Energy, Mineral, and Land Resources | Mining | Permit Transfers - 0-25 acres | $100 | $119 | 74-54.1.(a) |
Division of Energy, Mineral, and Land Resources | Mining | Permit Transfers - 26+ acres | $100 | $119 | 74-54.1.(a) |
Division of Energy, Mineral, and Land Resources | Mining | Annual Operating Fee | $400 | $474 | 74-54.1.(a1) |
Division of Energy, Mineral, and Land Resources | Mining | Late Fee per month late | $50 | $59 | 74-54.1.(a1) |
Division of Water Resources | Wastewater Operators Renewal | Examination including Certificate | $85 | $101 | 90A-42.(a)(1) |
Division of Water Resources | Wastewater Operators Renewal | Temporary Certificate | $200 | $237 | 90A-42.(a)(2) |
Division of Water Resources | Wastewater Operators Renewal | Temporary Certification Renewal | $300 | $356 | 90A-42.(a)(3) |
Division of Water Resources | Wastewater Operators Renewal | Conditional Certificate | $75 | $89 | 90A-42.(a)(4) |
Division of Water Resources | Wastewater Operators Renewal | Reciprocity Certificate | $100 | $119 | 90A-42.(a)(6) |
Division of Water Resources | Wastewater Operators Renewal | Voluntary Conversion Certificate | $50 | $59 | 90A-42.(a)(6a) |
Division of Water Resources | Wastewater Operators Renewal | Annual Renewal, per certification | $50 | $53 | 90A-42.(a)(7) |
Division of Water Resources | Wastewater Operators Renewal | Replacement of Certificate | $20 | $24 | 90A-42.(a)(8) |
Division of Water Resources | Wastewater Operators Renewal | Late Payment Annual Renewal | $50 | $59 | 90A-42.(a)(9) |
Division of Water Resources | Wastewater Operators Renewal | Late Payment Annual Renewal, per year | $100 | $119 | 90A-42.(a)(9) |
Division of Water Resources | Wastewater Operators Renewal | Mailing List | $25 | $30 | 90A-42.(a)(10) |
Division of Water Resources | Animal Waste Operator | Examination and Certificate | $85 | $90 | 90A-47.4(a) |
Division of Water Resources | Animal Waste Operator | Certificate Renewal | $25 | $26 | 90A-47.4(b) |
Division of Energy, Mineral, and Land Resources | Sedimentation | Application and Compliance $100 per disturbed acre | $100 | $119 | 113A-54.2(a) |
Division of Coastal Management | CAMA Permit | General Permit for placement of riprap to protect wetlands in estuarine and public trust waters | $400 | $474 | 113A-119.1(a) |
Division of Coastal Management | CAMA Permit | General Permit for installation of sandbags | $400 | $474 | 113A-119.1(a) |
Division of Coastal Management | CAMA Permit | General Permit for placement of rip rap | $400 | $474 | 113A-119.1(a) |
Division of Coastal Management | CAMA Permit | General Permit for construction of a bulkhead | $400 | $474 | 113A-119.1(a) |
Division of Coastal Management | CAMA Permit | General Permit for maintenance excavation within existing canals, channels, basins and ditches in estuarine or public trust waters | $400 | $474 | 113A-119.1(a) |
Division of Coastal Management | CAMA Permit | General Permit for beach bulldozing | $400 | $474 | 113A-119.1(a) |
Division of Coastal Management | CAMA Permit | General Permit for replacement of bridges and culverts | $400 | $474 | 113A-119.1(a) |
Division of Coastal Management | CAMA Permit | General Permit for Estuarine Enhancement Program mitigation | $400 | $474 | 113A-119.1(a) |
Division of Coastal Management | CAMA Permit | All other General Permits | $400 | $474 | 113A-119.1(a) |
Division of Coastal Management | CAMA Permit | Minor Permit | $100 | $119 | 113A-119.1(a) |
Division of Coastal Management | CAMA Permit | Major Permit for private, non-commercial development that does not involve the filling or excavation of wetlands or open-water areas | $250 | $297 | 113A-119.1(a) |
Division of Coastal Management | CAMA Permit | Major Permit for public or commercial development, or projects that involve the filling or excavation of: A) one acre or less of wetlands or open-water areas, or B) less than 150 linear feet of stream | $400 | $474 | 113A-119.1(a) |
Division of Coastal Management | CAMA Permit | Major Permit for development that involves the filling or excavation of more than one acre of wetlands or open-water areas, or 150 linear feet or more of stream | $475 | $563 | 113A-119.1(a) |
Division of Coastal Management | CAMA Permit | Major development extension request | $100 | $119 | 113A-119.1(a) |
Division of Coastal Management | CAMA Permit | Minor modification to a Major Permit | $100 | $119 | 113A-119.1(a) |
Division of Coastal Management | CAMA Permit | Major modification to a Major Permit - correlates to original type of permit above that is $250 | $250 | $297 | 113A-119.1(a) |
Division of Coastal Management | CAMA Permit | Major modification to a Major Permit - correlates to original type of permit above that is $400 | $400 | $474 | 113A-119.1(a) |
Division of Coastal Management | CAMA Permit | Major modification to a Major Permit - correlates to original type of permit above that is $475 | $475 | $563 | 113A-119.1(a) |
Division of Coastal Management | CAMA Permit | Permit transfer | $100 | $119 | 113A-119.1(a) |
Division of Waste Management | Solid Waste - Septage | Septage Management - one pumper truck | $800 | $845 | 130A-291.1(e) |
Division of Waste Management | Solid Waste - Septage | Septage Management - two pumper trucks | $950 | $1,003 | 130A-291.1(e) |
Division of Waste Management | Solid Waste- Septage | Septage Management - three or more pumper trucks | $1,500 | $1,584 | 130A-291.1(e) |
Division of Waste Management | Hazardous Waste | Annual fee for 1000 + kg hazardous waste/month | $1,440 | $1,660 | 130A-294.1(e) |
Division of Waste Management | Hazardous Waste | Annual fee for 100-999 kg hazardous waste/month | $300 | $317 | 130A-294.1(f) |
Division of Waste Management | Hazardous Waste | Hazardous Waste transport | $840 | $996 | 130A-294.1(j) |
Division of Waste Management | Hazardous Waste | Hazardous Waste storage, treatment, disposal activity fee for each activity | $1,680 | $1,992 | 130A-294.1(k) |
Division of Waste Management | Hazardous Waste | Permit Application for Hazardous Waste Storage Facility | $14,000 | $16,604 | 130A-294.1(m)(1) |
Division of Waste Management | Hazardous Waste | Permit Application for Hazardous Waste Treatment Facility | $21,000 | $24,906 | 130A-294.1(m)(2) |
Division of Waste Management | Hazardous Waste | Permit Application for Hazardous Waste Disposal Facility | $35,000 | $41,510 | 130A-294.1(m)(3) |
Division of Waste Management | Solid Waste | Municipal Solid Waste Landfill <100,000 tons per year | $6,125 | $7,264 | 130A-295.8(d1)(1) |
Division of Waste Management | Solid Waste | Municipal Solid Waste Landfill <100,000 tons per year > 250,000 tons per year | $7,000 | $8,302 | 130A-295.8(d1)(2) |
Division of Waste Management | Solid Waste | Municipal Solid Waste Landfill >250,000 tons per year | $8,750 | $10,378 | 130A-295.8(d1)(3) |
Division of Waste Management | Solid Waste | Post-Closure Municipal Solid Waste Landfill | $1,000 | $1,186 | 130A-295.8(d1)(4) |
Division of Waste Management | Solid Waste | Construction and Demolition Landfill of < 25,000 tons per year | $4,813 | $5,708 | 130A-295.8(d1)(5) |
Division of Waste Management | Solid Waste | Construction and Demolition Landfill of > 25,000 tons per year | $5,500 | $6,523 | 130A-295.8(d1) (6) |
Division of Waste Management | Solid Waste | Post-Closure Construction and Demolition Landfill | $500 | $593 | 130A-295.8(d1)(7) |
Division of Waste Management | Solid Waste | Industrial Landfill accepting <100,000 tons/year | $5,500 | $6,523 | 130A-295.8(d1)(8) |
Division of Waste Management | Solid Waste | Industrial Landfill accepting >100,000 tons/year | $6,875 | $8,154 | 130A-295.8(d1)(9) |
Division of Waste Management | Solid Waste | Post-Closure Industrial Landfill | $500 | $593 | 130A-295.8(d1)(10) |
Division of Waste Management | Solid Waste | Transfer Station accepting less than 25,000 tons/year solid waste | $1,500 | $1,779 | 130A-295.8(d1)(11) |
Division of Waste Management | Solid Waste | Transfer Station accepting 25,000 or more tons/year solid waste | $1,875 | $2,224 | 130A-295.8(d1)(12) |
Division of Waste Management | Solid Waste | Treatment and Processing Facility | $750 | $792 | 130A-295.8(d1)(13) |
Division of Waste Management | Solid Waste | Tire Monofill | $1,000 | $1,056 | 130A-295.8(d1)(14) |
Division of Waste Management | Solid Waste | Incinerator accepting less than 200 tons per day of solid waste | $500 | $593 | 130A-295.8(d1)(15) |
Division of Waste Management | Solid Waste | Incinerator accepting more than 200 tons per day of solid waste | $1,000 | $1,056 | 130A-295.8(d1)(15a) |
Division of Waste Management | Solid Waste | Large Compost Facility | $800 | $845 | 130A-295.8(d1)(16) |
Division of Waste Management | Solid Waste | Small Compost Facility | $300 | $317 | 130A-295.8(d1)(16a) |
Division of Waste Management | Solid Waste | Land Clearing and Inert Debris Landfill | $900 | $950 | 130A-295.8(d1)(17) |
Division of Waste Management | Solid Waste | Permit Modification to a solid waste facility | $500 | $528 | 130A-295.8(d3) |
Division of Waste Management | Solid Waste | Cumulative Impact Review | $1,000 | $1,056 | 130A-295.8(d4) |
Division of Waste Management | Solid Waste | Assessment and correction action required by any solid waste facility additional fee each year that is taking place | $750 | $792 | 130A-295.8(d5) |
Division of Waste Management | Remedial Action Program Fee | Program Fee | $1,000 | $1,186 | 130A-310.9(a) |
Division of Waste Management | Brownfields Redevelopment Fees | Brownfield Agreement review initial fee | $2,000 | $2,372 | 130A-310.39(a)(1) and (2) |
Division of Waste Management | Risk-Based Remediation Program Fees | Application fee $5000 per acre but no more than $100,000 | $5,000 | $5,930 | 130A-310.76(a)(1) |
Division of Waste Management | Risk-Based Remediation Program Fees | Oversight fee $500 per acre but no more than $25,000 | $500 | $593 | 130A-310.76(a)(2) |
Division of Water Resources | Public Water Annual Operating Permit | Non-transient non-community permit fee | $190 | $201 | 130A-328(b) |
Division of Water Resources | Public Water Annual Operating Permit | Community Water Systems and number of people served, starting with fewer than 50 | $320 | $338 | 130A-328(b) |
Division of Water Resources | Public Water Annual Operating Permit | Community Water Systems and number of people served: 50-100 | $340 | $359 | 130A-328(b) |
Division of Water Resources | Public Water Annual Operating Permit | Community Water Systems and number of people served: More than 100 but no more than 200 | $410 | $433 | 130A-328(b) |
Division of Water Resources | Public Water Annual Operating Permit | Community Water Systems and number of people served: More than 200 but no more than 300 | $430 | $454 | 130A-328(b) |
Division of Water Resources | Public Water Annual Operating Permit | Community Water Systems and number of people served: More than 300 but no more than 400 | $480 | $507 | 130A-328(b) |
Division of Water Resources | Public Water Annual Operating Permit | Community Water Systems and number of people served: More than 400 but no more than 500 | $520 | $549 | 130A-328(b) |
Division of Water Resources | Public Water Annual Operating Permit | Community Water Systems and number of people served: More than 500 but no more than 750 | $970 | $1,024 | 130A-328(b) |
Division of Water Resources | Public Water Annual Operating Permit | Community Water Systems and number of people served: More than 750 but no more than 1000 | $1,010 | $1,067 | 130A-328(b) |
Division of Water Resources | Public Water Annual Operating Permit | Community Water Systems and number of people served: More than 1000 but no more than 2000 | $1,050 | $1,109 | 130A-328(b) |
Division of Water Resources | Public Water Annual Operating Permit | Community Water Systems and number of people served: More than 2000 but no more than 3000 | $1,090 | $1,151 | 130A-328(b) |
Division of Water Resources | Public Water Annual Operating Permit | Community Water Systems and number of people served: More than 3000 but no more than 4000 | $1,690 | $1,785 | 130A-328(b) |
Division of Water Resources | Public Water Annual Operating Permit | Community Water Systems and number of people served: More than 4000 but no more than 5000 | $1,830 | $1,932 | 130A-328(b) |
Division of Water Resources | Public Water Annual Operating Permit | Community Water Systems and number of people served: More than 5000 but no more than 7500 | $2,410 | $2,545 | 130A-328(b) |
Division of Water Resources | Public Water Annual Operating Permit | Community Water Systems and number of people served: More than 7500 but no more than 10,000 | $2,580 | $2,724 | 130A-328(b) |
Division of Water Resources | Public Water Annual Operating Permit | Community Water Systems and number of people served: More than 10,000 but no more than 25,000 | $3,250 | $3,432 | 130A-328(b) |
Division of Water Resources | Public Water Annual Operating Permit | Community Water Systems and number of people served: More than 25,000 but no more than 50,000 | $3,660 | $3,865 | 130A-328(b) |
Division of Water Resources | Public Water Annual Operating Permit | Community Water Systems and number of people served: More than 50,000 but no more than 75,000 | $5,310 | $5,607 | 130A-328(b) |
Division of Water Resources | Public Water Annual Operating Permit | Community Water Systems and number of people served: More than 75,000 but no more than 100,000 | $5,840 | $6,167 | 130A-328(b) |
Division of Water Resources | Public Water Annual Operating Permit | Community Water Systems and number of people served: More than 100,000 but no more than 250,000 | $6,380 | $6,737 | 130A-328(b) |
Division of Water Resources | Public Water Annual Operating Permit | Community Water Systems and number of people served: More than 250,000 but no more than 500,000 | $6,910 | $7,297 | 130A-328(b) |
Division of Water Resources | Public Water Annual Operating Permit | Community Water Systems and number of people served: More than 500,000 | $7,440 | $7,857 | 130A-328(b) |
Division of Water Resources | Engineering Plan Review | Construction or alteration fees for distribution system - construction of water lines less than 5000 linear feet | $300 | $317 | 130A-328(c) |
Division of Water Resources | Engineering Plan Review | Construction or alteration fees for distribution system - construction of water lines 5000 linear feet or more | $400 | $422 | 130A-328(c) |
Division of Water Resources | Engineering Plan Review | Construction or alteration fees for distribution system - other construction or alteration | $150 | $158 | 130A-328(c) |
Division of Water Resources | Engineering Plan Review | Construction or alteration of ground water system - new system or new well | $400 | $422 | 130A-328(c) |
Division of Water Resources | Engineering Plan Review | Construction or alteration of ground water system - alteration | $200 | $211 | 130A-328(c) |
Division of Water Resources | Engineering Plan Review | Construction or alteration of a surface water system - new surface water treatment facility | $500 | $528 | 130A-328(c) |
Division of Water Resources | Engineering Plan Review | Construction or alteration of a surface water system - alteration of surface water treatment facility | $300 | $317 | 130A-328(c) |
Division of Water Resources | Engineering Plan Review | Construction or alteration of a surface water system - water system management plan review | $150 | $158 | 130A-328(c) |
Division of Water Resources | Engineering Plan Review | Construction or alteration of a surface water system - Miscellaneous maintenance | $100 | $106 | 130A-328(c) |
Division of Water Resources | Engineering Plan Review | Late fee for Public Water Annual Operating Permit | $150 | $178 | 130A-328(d) |
Division of Energy, Mineral, and Land Resources | Dam Safety | Application Fee for approval of construction or removal of dams may not exceed $200 or 2% of the actual cost of construction or removal of applicable dam | $500 | $593 | 143-215.28A(a1) |
Division of Energy, Mineral, and Land Resources | Dam Safety | Notification of a professionally supervised dam removal | $500 | $593 | 143-215.28A(a1) |
Division of Waste Management | Application Fee for Land Application of Petroleum-Contaminated Soil | Fee for a permit to apply petroleum contaminated soil | $480 | $569 | 143-215.3D(e)(5) |
Division of Water Resources | Wastewater | Major Individual NPDES Permits | $4,625 | $4,884 | 143-215.3D(a)(1) |
Division of Water Resources | Wastewater | Minor Individual NPDES Permits | $1,150 | $1,214 | 143-215.3D(a)(2) |
Division of Water Resources | Wastewater | Single-Family Residence. | $60 | $71 | 143-215.3D(a)(3) |
Division of Water Resources | Wastewater | Wastewater Discharge General Permits | $100 | $119 | 143-215.3D(a)(4) |
Division of Water Resources | Wastewater | Recycle Systems | $520 | $549 | 143-215.3D(a)(5) |
Division of Water Resources | Wastewater | Major Nondischarge Permits | $1,760 | $1,859 | 143-215.3D(a)(6) |
Division of Water Resources | Wastewater | Minor Nondischarge Permits | $1,160 | $1,225 | 143-215.3D(a)(7) |
Division of Water Resources | Wastewater | Authorizations to Construct | $1,000 | $1,056 | 143-215.3D(a)(9) |
Division of Energy, Mineral, and Land Resources | Stormwater Program | NPDES Stormwater Permits - The fee for an industrial NPDES individual permit | $1,200 | $1,267 | 143-215.3D(a)(10a) |
Division of Energy, Mineral, and Land Resources | Stormwater Program | NPDES Stormwater Permits - The fee for coverage under a construction or industrial NPDES general permit | $120 | $127 | 143-215.3D(a)(10b) |
Division of Energy, Mineral, and Land Resources | Stormwater Program | NPDES Stormwater Permits - The fee for an NPDES MS4 major permit | $4,200 | $4,435 | 143-215.3D(a)(10c) |
Division of Energy, Mineral, and Land Resources | Stormwater Program | NPDES Stormwater Permits - The fee for an NPDES MS4 minor permit | $1,000 | $1,056 | 143-215.3D(a)(10d) |
Division of Energy, Mineral, and Land Resources | Stormwater Program | NPDES Stormwater Permits - The fee for an NPDES no exposure certification | $250 | $264 | 143-215.3D(a)(10e) |
Division of Water Resources | Wastewater | Application and annual fees for consent special orders - Major Consent Special Orders initial fee | $400 | $474 | 143-215.3D(c)(1) |
Division of Water Resources | Wastewater | Application and annual fees for consent special orders - Major Consent Special Orders annual fee | $500 | $593 | 143-215.3D(c)(1) |
Division of Water Resources | Wastewater | Application and annual fees for consent special orders - Minor Consent Special Orders initial fee | $400 | $474 | 143-215.3D(c)(2) |
Division of Water Resources | Wastewater | Application and annual fees for consent special orders - Minor Consent Special Orders annual fee | $250 | $297 | 143-215.3D(c)(2) |
Division of Water Resources | Wastewater | Sewer System Extension Permits - application fee for new, extension or variance of system | $600 | $634 | 143-215.3D(e)(1) |
Division of Energy, Mineral, and Land Resources | Stormwater Program | State Stormwater Permits - new or major modification based on the number of stormwater control measures (SCM) - one or less | $1,000 | $1,056 | 143-215.3D(e)(2)(a1) |
Division of Energy, Mineral, and Land Resources | Stormwater Program | State Stormwater Permits - new or major modification based on the number of stormwater control measures (SCM) - two | $1,250 | $1,320 | 143-215.3D(e)(2)(a2) |
Division of Energy, Mineral, and Land Resources | Stormwater Program | State Stormwater Permits - new or major modification based on the number of stormwater control measures (SCM) - three | $1,750 | $1,848 | 143-215.3D(e)(2)(a3) |
Division of Energy, Mineral, and Land Resources | Stormwater Program | State Stormwater Permits - new or major modification based on the number of stormwater control measures (SCM) - four or more | $2,250 | $2,376 | 143-215.3D(e)(2)(a4) |
Division of Energy, Mineral, and Land Resources | Stormwater Program | State Stormwater Permit - Minor modification | $250 | $264 | 143-215.3D(e)(2b) |
Division of Energy, Mineral, and Land Resources | Stormwater Program | State Stormwater Permit - Renewal or transfer | $750 | $792 | 143-215.3D(e)(2c) |
Division of Energy, Mineral, and Land Resources | Stormwater Program | State Stormwater Permit - combination renewal and transfer | $1,500 | $1,584 | 143-215.3D(e)(2d) |
Division of Energy, Mineral, and Land Resources | Stormwater Program | State Stormwater Permit - new coverage under a general permit | $700 | $739 | 143-215.3D(e)(2e) |
Division of Water Resources | Wastewater | Major Water Quality Certifications. - The fee for a water quality certification involving one acre or more of wetland fill or 150 feet or more of stream impact | $767 | $810 | 143-215.3D(e)(3) |
Division of Water Resources | Wastewater | Minor Water Quality Certifications. - The fee for a water quality certification involving less than one acre of wetland fill or less than 150 feet of stream impact | $323 | $341 | 143-215.3D(e)(4) |
Division of Water Resources | Wastewater | Permit for Land Application of Petroleum Contaminated Soils. - The fee for a permit to apply petroleum contaminated soil to land | $480 | $569 | 143-215.3D(e)(5) |
Division of Water Resources | Animal Waste Management Systems | Annual fee for a system with a design capacity of 38,500 or more and less than 100,000 pounds steady state live weight | $60 | $71 | 143-215.10G(a)(1) |
Division of Water Resources | Animal Waste Management Systems | Annual fee for a system with a design capacity of 38,500 or more and less than 100,000 pounds steady state live weight | $180 | $213 | 143-215.10G(a)(2) |
Division of Water Resources | Animal Waste Management Systems | Annual fee For a system with a design capacity of 800,000 pounds or more steady state live weight | $360 | $427 | 143-215.10G(a)(3) |
Division of Water Resources | Animal Waste Management Systems | Annual permit fee to a dry litter poultry facility - For a system with a permitted capacity of less than 25,000 laying chickens, less than 37,500 nonlaying chickens, or less than 16,500 turkeys | $60 | $71 | 143-215.10G(a1)(1) |
Division of Water Resources | Animal Waste Management Systems | Annual permit fee to a dry litter poultry facility - For a system with a permitted capacity of 25,000 or more but less than 200,000 laying chickens, 37,500 or more but less than 290,000 nonlaying chickens, 16,500 or more but less than 133,000 turkeys | $180 | $213 | 143-215.10G(a1)(2) |
Division of Water Resources | Animal Waste Management Systems | Annual permit fee to a dry litter poultry facility - For a system with a permitted capacity of more than 200,000 laying chickens, more than 290,000 nonlaying chickens, or more than 133,000 turkeys | $360 | $427 | 143-215.10G(a1)(3) |
Division of Waste Management | Underground Storage Tank fees | Annual operating fee - each compartment of a commercial underground storage tank that is designed to independently contain a petroleum product is a separate petroleum commercial underground storage tank | $420 | $498 | 143-215.94C(a) |
Division of Waste Management | Underground Storage Tank fees | Annual operating fee - late fee for owner or operator of a commercial underground storage tank who fails to pay an annual operating fee due under this section within 30 days of the date that the fee $5 per day | $5 | $6 | 143-215.94C(e) |
Division of Energy, Mineral, and Land Resources | Wind Energy Facility | Permit fee for proposed wind energy facility or proposed wind energy facility expansion lesser of $200 per megawatt or $50,000 | $200 | $237 | 143-215.119© |
Division of Energy, Mineral, and Land Resources | Wind Energy Facility Annual Late Fee | Annual fee of $75 per permitted megawatt of capacity payable on or before Sept 1 for the previous fiscal year and late fee of $75 per month per permit that annual operating fee is late | $75 | $89 | 143-215.125A |
Division of Energy, Mineral, and Land Resources | Express Permitting | Express Application Review shall not exceed $5500 | $5,500 | $5,808 | 143B-279.13(b) |
Division of Energy, Mineral, and Land Resources | Express Permitting | Express Application Review shall not exceed $4500 | $4,500 | $4,752 | 143B-279.13 |