EPA comment period begins on 04/28/2021 and ends on 06/12/2021.
Draft Permit
Draft Permit Review
Public Notice
Engineer: Russell Braswell
EPA comment period begins on 04/28/2021 and ends on 06/12/2021.
Draft Permit
Draft Permit Review
Public Notice
Engineer: Russell Braswell
Public comment period begins on 04/28/2021 and ends on 05/28/2021.
Draft Permit
Draft Permit Review
Public Notice
Engineer: Russell Braswell
The Division of Air Quality (DAQ) will host a digital public hearing on Monday, May 24 on the draft Title V permit for Enviva Northampton, LLC. The facility is required to obtain a Title V permit under the terms of its current operating permit. The draft Title V permit does not include any significant operational changes at the wood pellet facility and the potential to emit remains the same as under the current permit.
Public comment period begins on 04/24/2021 and ends on 05/26/2021.
Enviva Pellets Northampton, LLC Remote Public Hearing information can be found here.
EPA comment period begins on 04/24/2021 and ends on 05/08/2021.
Enviva Pellets Northampton, LLC Remote Public Hearing information can be found here.
EPA comment period begins on 04/24/2021 and ends on 05/08/2021.
Enviva Pellets Northampton, LLC Remote Public Hearing information can be found here.
Public comment period begins on 04/21/2021 and ends on 05/21/2021.
Draft Permit
Draft Permit Review
Public Notice
Engineer: Jeff Twisdale
Draft EJ Report
Public comment period begins on 04/21/2021 and ends on 05/21/2021.
Draft Permit
Draft Permit Review
Public Notice
The Division of Air Quality (DAQ) is hosting a digital public hearing to receive comments on the requested renewal with consolidated modification requests of the University of North Carolina at Chapel Hill's (UNC) current Title V air permit.
If you wish to speak at the public hearing, you must register by 4:00 p.m. on May 3. To register, please visit: https://bit.ly/3b7g3b0 or call (919) 618-0968.