EPA comment period begins on 07/13/2018 and ends on 08/27/2018.
Draft Permit
Draft Permit Review
Public Notice
Engineer: Jenny Sheppard
EPA comment period begins on 07/13/2018 and ends on 08/27/2018.
Draft Permit
Draft Permit Review
Public Notice
Engineer: Jenny Sheppard
EPA comment period begins on 07/13/2018 and ends on 08/27/2018.
Draft Permit
Draft Permit Review
Public Notice
Engineer: Jenny Sheppard
Public comment period begins on 07/13/2018 and ends on 08/12/2018.
Draft Permit
Draft Permit Review
Public Notice
Engineer: Jenny Sheppard
Permit #: NC0088323
Facility: Grantsboro WTP
Owner: Pamilco County
County: Pamlico
The division has published a public notice in the Pamlico News.
Permit #: NC0088358
Facility: Vandemere WTP
Owner: Pamlico County
County: Pamlico
The division has published a public notice in the Pamlico News.
Pamlico County Water System applied to renew NPDES permit for the Vandemere WTP [NC0088358] discharging filter-backwash wastewater to Smith Creek, Neuse River Basin. Currently, Total Suspended Solids (TSS), Total Residual Chlorine (TRC), pH, Total Copper and Total Zinc are water-quality limited. This discharge may affect future wasteload allocations in this portion of Smith Creek.
June 28, 2018
To: DENR-DWR-Wetlands-Public Listserv
From: Karen Higgins, 401 & Buffer Permitting Branch
Re: Proposed Riparian Buffer & Nutrient Offset BPDP in the Jordan Lake Watershed – Wildlands Holdings IV, LLC; Proposed Mitigation Banking Instrument in the Neuse River Basin/Falls Watershed – Wildlands Holdings V, LLC; Proposed Riparian Buffer & Nutrient Offset BPDP in the Neuse River Basin/Falls Watershed – Wildlands Holdings V, LLC
June 28, 2018
To: DENR-DWR-Wetlands-Public Listserv
From: Karen Higgins, 401 & Buffer Permitting Branch
Re: Proposed Riparian Buffer & Nutrient Offset BPDP in the Jordan Lake Watershed – Wildlands Holdings IV, LLC; Proposed Mitigation Banking Instrument in the Neuse River Basin/Falls Watershed – Wildlands Holdings V, LLC; Proposed Riparian Buffer & Nutrient Offset BPDP in the Neuse River Basin/Falls Watershed – Wildlands Holdings V, LLC
Public comment period begins on 06/29/2018 and ends on 07/29/2018.
Draft Permit
Draft Permit Review
Public Notice
Engineer: Betty Gatano