EPA comment period begins on 08/07/2017 and ends on 09/21/2017.
Draft Permit
Draft Permit Review
Public Comment
Engineer: Jenny Sheppard
EPA comment period begins on 08/07/2017 and ends on 09/21/2017.
Draft Permit
Draft Permit Review
Public Comment
Engineer: Jenny Sheppard
EPA comment period begins on 08/07/2017 and ends on 09/21/2017.
Draft Permit
Draft Permit Review
Public Comment
Engineer: Jenny Sheppard
Public comment period begins on 08/07/2017 and ends on 09/06/2017.
Draft Permit
Draft Permit Review
Public Comment
Engineer: Jenny Sheppard
Michael Corn (735 Butler Bridge Road, Fletcher, N.C. 28732) has applied for the renewal of coverage under the non-discharge Cattle Waste Management System NPDES General Permit (NCA300000) for the Small Acres Dairy (Facility No. 45-7) in Henderson County. This facility is currently permitted under the NPDES Cattle Waste Management System General Permit (NCA300000; COC No. NCA345007) and applies treated wastewater to adjacent sprayfields. Written comments must be received before the end of the comment period which is Sept. 8, 2017.
Public comment or objection to the following draft permit is invited. Submit written comments to DEMLR at the address shown below. All comments received prior to September 15, 2017 will be considered in the final determination regarding permit issuance and permit provisions.
The Division of Waste Management has taken comments from a stakeholder stating that, for closure of a soil remediation permitted facility, having a closure/cleanup based on a non-detection level of soil contamination is unreasonable. Changing the closure/cleanup to a risk-based closure/cleanup requirement requires rule changes to modify certain closure/cleanup requirements applicable to the soil remediation permitting. This change will be protective of human health and the environment and will reduce costs to some stakeholders.
The Division of Waste Management has taken comments from a stakeholder stating that, for closure of a soil remediation permitted facility, having a closure/cleanup based on a non-detection level of soil contamination is unreasonable. Changing the closure/cleanup to a risk-based closure/cleanup requirement requires rule changes to modify certain closure/cleanup requirements applicable to the soil remediation permitting.
Public comment period begins on 08/01/2017 and ends on 08/31/2017.
Draft Permit
Draft Permit Review
Public Notice
Engineer: Russell Braswell
EPA comment period begins on 08/01/2017 and ends on 09/15/2017.
Draft Permit
Draft Permit Review
Public Notice
Engineer: Russell Braswell
EPA comment period begins on 08/01/2017 and ends on 09/15/2017.
Draft Permit
Draft Permit Review
Public Notice
Engineer: Russell Braswell