DWR accepting public comments on the Draft Rocky River Turbidity TMDL - Yadkin River Basin

-
Add to calendar:
Google Outlook iCal

The Draft Total Maximum Daily Load (TMDL) for turbidity for the Rocky River (Yadkin River Basin), North Carolina is now available for public comment. The draft TMDL was developed to meet requirements of Section 303(d) of the Federal Water Pollution Control Act to address turbidity impairments. It is subject to approval by EPA.

Draft TMDL Document

Interested parties are invited to comment on the draft TMDL by February 27, 2026. Comments should be directed to TMDL303dComments@deq.nc.gov and must be received no later than 5 pm on February 27, 2026.