Category:
Waste
|
|
Construction and Demolition Landfill Permit |
The construction and operation of a landfill facility for the acceptance of construction and demolition waste or debris as defined in North Carolina General Statute 130A or North Carolina Administrative Code Title 15A Subchapter 13B. |
EPA Identification Number Requirements for Generators of Hazardous Waste |
Hazardous waste generators are required to obtain an EPA Identification Number from the state. This number is site-specific. |
EPA Identification Number Requirements for Transporters of Hazardous Waste |
Allows the transport of hazardous waste in North Carolina. This activity requires an EPA identification number, which can be obtained from the state. This number is operator-specific. |
Hazardous Waste Management Permit |
Requires facilities to manage hazardous waste in accordance with the N.C. Hazardous Waste Management Rules. |
Hazardous Waste Post-closure Permit |
Requires an operation to monitor or remediate contamination resulting from past hazardous waste disposal practices in accordance with N.C. Hazardous Waste Management Rules. |
Hazardous Waste Research Development and Demonstration Permit |
Allows for the research, development and demonstration of new hazardous waste management techniques in accordance with N.C. Hazardous Waste Management Rules. |
Incinerator Permit |
The construction and operation of a landfill facility for the acceptance and incineration of solid waste. |
Industrial Landfill Permit |
The construction and operation of a landfill facility for the acceptance of industrial solid waste. |
Land Clearing and Inert Debris Landfill Permit |
The construction and operation of a landfill facility for the acceptance of land clearing and inert debris as defined in North Carolina General Statute 130A or North Carolina Administrative Code Title 15A Subchapter 13B. |
Municipal Solid Waste Landfill Permit |
The construction and operation of a landfill facility for the acceptance of municipal solid waste as defined in North Carolina General Statute 130A or North Carolina Administrative Code Title 15A Subchapter 13B. |
Petroleum Contaminated Soil Remediation Permit (Non-Discharge) |
Construction and operation of a contaminated soil treatment system. |
Resource Conservation and Recovery Act (RCRA) Emergency Permit Information |
The treatment, storage or disposal of hazardous waste under urgent or emergency situations to facilitate the protection of public health and the environment. |
Scrap Tire Hauler Registration |
Anyone engaged in the hauling of scrap tires in North Carolina must have this registration. However, a tire retailer (licensed under G.S. 105-164.29) who only hauls scrap tires generated at their business when replacement tires were sold is not required to register. |
Septage Detention and Treatment Facility Permit (SDTF) |
Construction and operation of a septage storage or treatment facility. |
Septage Land Application Site (SLAS) |
The land application of septage as a final disposal method. |
Septage Management Firm (Permit to Operate) |
Any person(s) engaging in the activity of pumping, transporting, storing, treating or disposing of septage must have a septage management firm permit prior to commencing operation. |
Solid Waste Composting Permit (SWC) |
The construction and operation of a solid waste composting facility. |
Tax Certification of Recycling and Resource Recovery Equipment and Facilities |
Special tax treatment for recycling and resource recovery equipment and facilities. |
Tire Monofill Permit |
The construction and operation of a landfill facility for the acceptance of tire monofill tire waste. |
Transfer Station Permit |
The construction and operation of a landfill facility for the acceptance, handling and transferring of municipal solid waste as defined in North Carolina General Statute 130A or North Carolina Administrative Code Title 15A Subchapter 13B. |
Treatment and Processing Facility Permit |
The construction and operation of a treatment and processing facility for the handling of solid waste for final disposal or for utilization by reclaiming or recycling. |
Yard Waste Notification Form |
The operation of a small Type 1 Composting facility or Treatment and Processing facility (primarily mulching or grinding), of yard waste and clean wood waste only. |
Yard Waste Treatment and Processing Permit |
This permit is required for the construction and operation of yard waste treatment and processing facilities - facilities that receive primarily organic wastes to be treated or processed for recycling or reuse in soil or plant related uses (primarily grinding or mulching of wood material). |