Jordan Lake Phosphorous Reduction Study Plan 2017
DWR Jordan Lake SePRO Study Plan 2017 ver4.pdf
Jordan Lake Phosphorous Reduction Study Plan 2017
DWR Jordan Lake SePRO Study Plan 2017 ver4.pdf
Jordan Lake Phosphorous Reduction Study Plan 2017
The objective of this study is to provide assessment information for the Jordan Lake In Situ chemical Pilot Project administered by SePRO Corp. Specifically, this includes sampling, testing, and analyzing water, sediment, and biota in areas of Jordan Lake prior to, during, and after proposed application of phosphorus-locking (Phoslock) and algaecide (Pak27) technologies as detailed in Section 14.13.(e) of S.L. 2017-57.
PDF remediated in Adobe Acrobat Pro to meet accessibility standards in 2026.