Stormwater Rules Archive
The State Stormwater rules were updated and readopted as of January 1, 2017. This page serves as an archive of older versions of the rules. These older versions may continue to be applicable to development projects that have been built as of January 1, 2017, or that received one of the authorizations listed in Rule 15A NCAC 02H .1001(5) prior to January 1, 2017. This includes authorizations such as building permits and site specific development plans.
Old Rules
15A NCAC 02H .1000 - .1020 State SW Program Requirements (ORW, HQW, USMP, Coastal Counties, Phase 2)
15A NCAC 02H .0126 Applied to NPDES Stormwater Program (by adoption) and Phase 2 Rules for MS4s
15A NCAC 02H .0152 Urbanizing Areas - See old Rule 15A NCAC 02H .1016.
15A NCAC 02H .0154 Post-Construction Practices - See old Rule 15A NCAC 02H .1017.