| Jordan_2023_EC_report_Final_CJsign.pdf |
| July 2022 EMC Teer Quarry and Eno River WS-IV CA Reclass RIA Att C.pdf |
| July 2022 EMC Teer Quarry and Eno River WS-IV CA Reclass-Map Att B.pdf |
| July 2022 EMC Teer Quarry and Eno River WS-IV CA Reclass-Memo Att A.pdf |
| Lead & Copper Rule Guidelines |
| Lead and Copper Rule Summary |
| Lead and Copper Water Quality Parameter Spreadsheet |
| Lead Service Line Inventory July 2025 |
| List Complaints 1-1-23 to 3-31-23.pdf |
| Little Tennessee 2024 ALMP Report |
| Long Form_Stage 2 DBPR Compliance Monitoring Plan Instructions_lfr.doc |
| Long Form_Stage 2 DBPR Compliance Monitoring Plan Instructions_lfr.pdf |
| Long Form_Stage 2 DBPR Compliance Monitoring Plan_2021_lfr.doc |
| Long Form_Stage 2 DBPR Compliance Monitoring Plan_2021_lfr.pdf |
| Lower Neuse Basin DWR MOA |
| Meeting1_Attendees |
| Mooresville Interbasin Transfer Notice of Intent |
| Moratorium List 5-20-2022 |
| Mountain Valley Pipeline Southgate Project Draft Community Profile |
| NC DWR Moratorium List |