The Stoney Creek Watershed pilot projects target flooding that impacts businesses, roadways and access to emergency services in Wayne County and Goldsboro. The pilot projects, and the NIFMP at large, seek to mitigate flooding using natural infrastructure and constructed systems that mimic natural processes. These systems can include strategies like building wetlands and restoring streams, which help store water and reduce flooding. The Stoney Creek pilot projects will also serve as the basis for expanding natural infrastructure flood mitigation projects to additional watersheds. Lessons learned through the Stoney Creek projects will help develop scaling solutions to enhance community flood resilience across North Carolina. NIFMP recently completed the first project at Wayne Community College (WCC), and the next project is expected to begin construction in the Fall 2026. NIFMP completed a Conceptual Plan for the entire watershed project, which guided the planning and implementation of subsequent projects throughout the project area.
Project 1: Wayne County Community College Stormwater Basin
Summary
The first NIFMP project in the Stoney Creek Watershed is a stormwater detention basin that was constructed to receive stormwater runoff from a portion of the WCC campus, infiltrate and retain the stormwater runoff before reaching the downstream waters of Reedy Branch. The RFP was awarded to Ecosystem Planning & Restoration, LLC in December 2022. DEQ broke ground in March 2025 and held a ribbon cutting ceremony December 2025 to celebrate the completion of the project.
Relevant Information
Project-Specific Criteria:
- Project footprint: 7.6 acres
- Flood reduction capacity (modeled): 100-yr storm discharge will be reduced by ~45 cubic feet per second, resulting in a 0.03-ft reduction in 100-yr storm water surface elevation downstream.
Project 2: Stoney Pond Retrofit
Summary
The second NIFMP project in Stoney Creek Watershed will consist of retrofitting an existing farm pond to provide additional water retention capacity, intercepting and retaining stormwater runoff before it reaches Stoney Creek. The retrofit will enhance the existing pond dam, approximately 260 feet in length and 6 feet in height, with a storage capacity of approximately 13.8 acre-feet at the normal pool elevation, to improve its ability to withstand larger flood events. Other improvements include reconstructing the outlet to increase storage capacity and attenuate stormwater flows from upstream farms and residential areas before they reach downstream properties. The earthen dam will be reconstructed in accordance with Natural Resources Conservation Service (NRCS) design standards and designed to retain the design storm, releasing stored water over 48 to 72 hours to reduce peak discharge rates. The design phase of this project is complete, and DEQ expects to break ground in Fall 2026.
Relevant Information
Project-specific criteria:
- Preliminary hydraulic and hydrologic modeling predict the 5-year discharge immediately downstream of the dam by about 20%, with larger reduction at smaller return periods.
- Predicted reduction of 1- and 2-year discharge of 56 and 52%, respectively.
- Constructed 2-foot by 2-foot concrete riser designed to slowly release stored runoff over an approximately 48- to 72-hour period.
- An emergency spillway will also be constructed.
- 13.8 acre-feet of flood storage.
Bladenboro South Main St. Flood Resiliency Project
Summary
The Bladenboro South Main St. Flood Resiliency Project is the NIFMP's newest project and seeks to alleviate nuisance flooding in Bladenboro, NC, located in Bladen County. Following the RFP award to Resource Environmental Solutions, LLC (RES), RES began working on the project in May 2026. The project approach builds on findings from the County Drainage Assessment, with additional site selection justification provided by RES:
- South Main Creek, Wateree Creek, Lateral 8 Creek and Bryant Swamp interact in a flat Coastal Plain setting.
- Historic canals and roadside ditches are undersized, failing to convey or store flood waters.
- Flooding affects mobility, school access, emergency shelters, homes, cemetery and downtown transportation.
RES has worked with the Town of Bladenboro and local landowners to procure easements for the project and propose several restoration actions and other interventions to mitigate localized flooding including:
- Re-meandering a straightened channel reach to hold baseflow
- Restore and extend floodplain footprint to attenuate floodwaters
- Rehabilitate or replace existing culverts so that they can withstand more significant storm flows and support the rest of the project area.
Relevant Information
Project-specific criteria:
- 11.8 acre-feet of maximum planning-level flood storage
- 2.59 acres of floodplain restoration
- 1.5 acres of flood storage wetlands
- 2,500 linear feet of baseflow channel & riparian buffer
- 3.0 acres of afforestation